After each crane installation it is needed to run through the commissioning procedure and crosscheck with the commissioning checklist. Load testing is a critical tool in ensuring crane safety. This test is to ensure that the customer is receiving a well-functioning and quality checked system and show if the stability calculation and the mounting have been proceeded correctly.
In early 2022, with well-trained engineer team, PVD Training had successfully completed crane inspection before commissioning and overhead crane load test at Tra Vinh Offshore Wind Farm, Viet Nam.